E – ASW – PP39
True or False? 4844 + 4243 is 8087E – ASW – PP40
True or False? 432 – 4.5 is 427.5E – ASW – WP1
The hockey rink had set aside $144 485 for construction.The cost to replace the flooring for the entire restaurant was $38 582. How much money does the hockey rink have left?E – ASW – WP2
Town hall purchased three properties for a total of $572 380. The first property cost $164 948 and the second proprerty cost $274 209. What was the cost of the third property?Page 10 of 18